您好,欢迎来到画鸵萌宠网。
搜索
您的当前位置:首页工程主管英文自我评价(3篇)

工程主管英文自我评价(3篇)

来源:画鸵萌宠网

工程主管英文自我评价

  首先我得明确表示,我不是很聪明,而且并不像其他北方人一样长的高大威猛,有时还会傻愣木枘,但我保证决不会误事的。如同其他来自其他农村的孩子一样,我比较坦诚, 勤奋务实,责任心强。当然北方人特有的豪情仗义我也少不了,如果是要我负责的我决对会咬紧牙关说一不二的做到最好更好。因为男人嘛就要有负得起责任的好豪情和勇气,有决策后面临风险和困难的气魄,有坚持后取得成绩时的冷静。喜欢博大、想学更多的知识,当然计算机、上岗证等这些都不在话下,自修了包括法律和经济学方面的书,也是一个不入流的文学爱好者吧,同学点歌祝词或是生日祝词一般是我写,也写些小散文诗歌的。忙里偷闲的时候,也喜欢上上网、打打球或是和同学一起偷看美女之类的,但是一样不精,略知一二。

工程主管英文自我评价

  __ years to participate in the work to __ April has been in Beijing Construction Engineering Construction Engineering Company Limited, a project of any technical work. Mainly to participate in bidding, writing programs and to the end, drawing on-site construction plans, do negotiations, and supervision, Party to deal with, as the completion of plans and so on. __ in April so far in the construction of an electronic plant in the field of civil engineers (Party on-site representatives). I have been involved in the work for nearly 20 years, working in the construction field for many years, from the initial maintenance, building leakage to the supervision of high-level decoration, high-rise buildings, municipal roads, bridges and so can be described as experienced, , Project deputy manager, project director, project director and other duties. From the grass-roots level to the management to bear the heavy work pressure.

  I am well aware that only with excellent professional skills, good communication skills and team spirit, in order to effectively carry out their work. At the same time I also use their spare time to actively improve themselves, completed undergraduate self (project management), also successfully passed the two construction division (housing construction, decoration) to test. I am eager to have more room for development in the new environment. Has also been in the Beijing Construction Engineering Group, the construction company for nearly 20 years, long-term engineering projects as chief engineer and project manager, which has served more than 20 million square meters of project total work, and more than 10 million square meters of project Manager, has a wealth of practical experience in construction. Work enthusiasm and initiative, with good interpersonal skills.

工程主管英文自我评价

  First, the construction quality inspection summary

  1, __ February 17 to the company after the meeting will be completed in accordance with the requirements of the company to check the Shenzhen Vanke Qian Lin Shanju project, Guangzhou Conghua Xia Wan to take the project to check the project technical documents, construction programs, construction quality, construction safety, The whole construction production system, the inspection of the quality problems, security risks, production points have been made to make a comprehensive reform measures and technical control methods, and check the existence of the sub-project technical information reported to the company.

  2, according to the examination of the problems I have done the relevant rectification and technical disclosure, and technical delivery to the foreman under the hands of the Secretary, and cut the requirements of the main management personnel in accordance with relevant technical information to control the implementation of the project quality control in the implementation process Because the management system does not build the leadership does not attach great importance to the quality of the project, not at all levels of implementation, so the implementation of the original grid is not in accordance with the relevant technical specifications data implementation, there is no implementation of the reasons for the analysis;

  A, in accordance with the current project construction in the quality, and safety issues to further analyze the quality of the project is the life, an enterprise should be quality first, safety first as the goal. First of all, the company's leadership on the quality of the project has not been a high degree of attention, the company did not develop a clear project quality management objectives, safety management objectives, there is no clear and feasible quality, safety control measures, and no uniform control objectives, A sub-project in the construction process will not be effectively controlled. B, the project quality management is the biggest flaw is not doing a good job targeted technical control of the book, senior management of the sub-project quality management objectives are not clear, security management is not clear, not to mention there are What to guide the effective control of technical documents, volatility and randomness are relatively large, according to the inspection results can reflect the pre-implementation process, sub-project construction is basically based on the discretion of the foreman to command operations, regardless of technical level , Not in accordance with the relevant regulatory requirements to make effective control of the relevant documents.

  C, good technical disclosure is one of the conditions to effectively control the quality of the project, to this end, each sub-project should be carried out before the implementation of the end, operating technology, Program, is the process of construction of specific guidance documents, good technical first of all project managers should attach great importance to, and must be clear to the end of the content, including construction methods, quality requirements and acceptance criteria, the construction process should pay attention to issues that may arise Unexpected problems and emergency measures. Key parts, or technical difficulties, the construction of complex sub-projects, do not do a good job at the end of technical sub-project, shall not enter the formal implementation.

  Second, the production and quality management overview

  1, the construction project is a production of a single, liquidity, large fluctuations, it is not like the general industrial products as the production line so standardized, a fixed production lines, a standardized production technology and improve the detection technology, Of the production equipment and stable production environment, so the project quality is easy to produce fluctuations and fluctuations are still relatively large, while affecting the quality of the project is still more factors, any of which factors change, will make the project quality fluctuations. Such as the use of material specifications varieties of errors, improper construction methods, the operation did not follow procedures, mechanical equipment failure, design errors, the production system construction environment, and so will cause the project quality accident. A major factor is the human factor, according to my company is currently under construction projects, the existence of quality problems, and the vast majority of security risks caused by human factors of quality and safety issues, the total summed up in five , Human factors, material factors, mechanical factors, construction methods, construction environment five factors.

  2, personnel factors, people are the main production and operation activities, but also the construction of the project decision-makers, managers, operators, the whole process of project construction, such as project planning, decision-making, surveying, design and construction, To complete. The quality of personnel, that is, people's cultural level, technical level, decision-making ability, management ability, work ability, control ability, physical quality and professional ethics, will directly affect the quality of construction, so the personnel factor is an important impact on project quality factor. Therefore, it is necessary to strengthen the management of their own management quality, improve the quality and safety of management quality, first of all from the leadership to start from the leadership.

因篇幅问题不能全部显示,请点此查看更多更全内容

Copyright © 2019- huatuo8.com 版权所有 湘ICP备2023022238号-1

违法及侵权请联系:TEL:199 1889 7713 E-MAIL:2724546146@qq.com

本站由北京市万商天勤律师事务所王兴未律师提供法律服务